How long does a house extension take from start to finish?
The build itself is only part of the story. Here is the whole sequence, with the pieces that most often catch people out.
Design and drawings
Expect several weeks to settle a design, produce drawings and, if needed, structural calculations. Rushing this is the most common cause of delays later, because changes on site cost more than changes on paper.
Approvals
A householder planning application is normally decided within about eight weeks. A lawful development certificate takes a similar time. Building Regulations approval runs alongside. Where Party Wall notices are needed, allow one or two months for them.
Booking the builder
Good builders are booked ahead. Once you have drawings and a written quote, ask for a start window and what it depends on, such as approvals or materials.
The build
A single-storey extension typically takes 10 to 16 weeks on site: groundworks and foundations, then walls, roof, windows and a weathertight shell, then first and second fix and finishes. Larger or two-storey projects take longer.
Completion
Once the building control inspector is satisfied, the completion certificate is issued. Keep it with your house papers. Allow a few weeks at the end for snagging and final inspections.
Free site visit and quote
Tell us about the project at hello@chathambuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.